Technical Specifications of 03 STS Quay Cranes: 03 Super Post-Panamax Ship-to-Shore (STS) container gantry cranes manufactured by Mitsui Engineering & Shipbuilding (MES), Japan. Rated lifting capacity under spreader: 65 metric tons (twin-lift capable for 02 x 20ft containers simultaneously); lifting height above rail: 43m; waterside outreach: 65m (up to 22-24 container rows across vessel deck); landside backreach: 15m; design handling rate: 30–35 moves/hour; fully capable of servicing Ultra Large Container Vessels (ULCV) up to 160,000 DWT.
Reception and Offloading Project of 03 Mitsui STS Cranes at Tan Cang Cai Mep Port
Client: Tan Cang – Cai Mep Thi Vai Terminal One Member Co., Ltd.
Project Location: Tan Cang Cai Mep Deep-Sea International Terminal
Execution Period: Q1 / 2017
Scope of Work: Berthing coordination for specialized heavy-lift ocean vessel transporting 03 STS cranes from Japan to Cai Mep, engineering sea fastening unlashing, roll-off onto wharf rails, structural alignment, electrical commissioning support, and performance testing.
Project Video

