SP09  |  PILLAR 3 — OFFSHORE WIND & HEAVY-LIFT

Wind-Power T&I Turnkey
Integrated Transport & Installation for Nearshore & Offshore Wind Farms

Backed by the marine infrastructure of Saigon Newport Corporation (SNP) – Complete T&I turnkey capability including heavy transport, marine marshaling port, and offshore turbine erection.

SLA:  T&I Turnkey EPC  |  500+ MW Installed  |  Certified Marine Crews  |  Zero Lost-Time Incidents

CONSULT SP09 SPECIALIST Explore Pillar

500+
MW Installed Capacity
100%
On-Schedule Handover
0
Marine Safety Incidents
48 Axles
SPMT Heavy Capacity
OPERATIONAL CHALLENGES

6 Key Challenges We Solve

Common technical bottlenecks faced by ports and industrial terminals — and our proven solutions.

01
Tight Offshore Weather Windows & High Wave Risks
Monsoon seasons and tidal fluctuations restrict marine operations to narrow installation windows.
02
Shortage of Certified Heavy-Lift Barges & Marine Cranes
Lifting 80m+ tower sections and 100T+ nacelles onto offshore foundations requires specialized marine jack-up or anchor barges.
03
Complex Port Marshaling & Staging Logistics
Storing and handling 70m–100m wind turbine blades and heavy tower cans requires dedicated deep-water quays with high ground bearing capacity.
04
High Risk of Structural Damage During Marine Transport
Improper sea fastening or dynamic marine wave acceleration damages sensitive generator bearings and blade surfaces.
05
Fragmented Supply Chains Between Logistics and Installation
Hiring separate transport and marine crane contractors causes inter-party blame and costly weather downtime delays.
06
Strict International Offshore Safety Standards (GWO / DNV)
Offshore wind projects enforce zero-tolerance HSE protocols requiring Global Wind Organisation (GWO) certified personnel.
CORE COMMITMENTS

Specialized Capabilities & Superior SLA

Integrated T&I Single-Point Turnkey Contracting
Unified responsibility from port of arrival marshaling, barging, load-out, sea fastening, to offshore crane erection.
Strategic Marine Marshaling Base (Tan Cang Petro Services)
Deep-water quayside with heavy ground bearing capacity (> 20 T/m²) for WTG blade staging, tower pre-assembly, and load-out.
Heavy Marine Fleet & Certified Offshore Riggers
Deck cargo barges up to 10,000 DWT, anchor handling tugs (AHT), 500T crawler cranes, and GWO-certified rigging crews.
Marine Warranty Survey (MWS) & Dynamic 3D Simulation
Comprehensive hydrostatic calculation, ballasting plan, sea-fastening design, and lifting simulations approved by top MWS surveyors.
PROVEN TRACK RECORD

Case Studies & Measurable Impact

TAN CANG TECH
VERIFIED CASE

Transport & Nearshore Installation of 12 Wind Turbines — Tra Vinh
Client: Tra Vinh Offshore Wind Project
48 MW
Total Installed Capacity
12 WTGs
Erected Successfully
100%
Weather Window Optimized

Executed marshaling, Ro-Ro load-out, marine transport, and offshore tandem erection of 12 wind turbines (4.0 MW each) in intertidal shallow waters with zero incidents.

Transport & Nearshore Installation of 12 Wind Turbines — Tra Vinh / Tra Vinh Offshore Wind Project
TAN CANG TECH
VERIFIED CASE

Staging Port Logistics & Blade Marshaling — Dong Hai 1 Wind Farm
Client: Bac Lieu Wind Farm
75 Blades
Marshaled & Dispatched
0
Structural Damage
100%
On-Time Barge Load-Out

Managed staging port logistics, SPMT heavy-haulage, and barge load-out for 75 turbine blades (68m length) and tower sections under strict OEM handling guidelines.

Staging Port Logistics & Blade Marshaling — Dong Hai 1 Wind Farm / Bac Lieu Wind Farm
EXPERT FAQ

Frequently Asked Questions

What marine equipment do you deploy for nearshore wind installation?
+
We deploy heavy flat-top deck barges (up to 10,000 DWT), anchor positioning tugs, 350T–500T crawler cranes on marine spud barges, and hydraulic pile driving hammers.
Where is your primary wind marshaling port located?
+
Our primary marshaling facilities are located at Tan Cang Petro Services (Vung Tau) and deep-water berths in Southern Vietnam offering direct sea access.
Are your offshore installation teams GWO certified?
+
Yes. 100% of our offshore project engineers, riggers, and crane operators possess valid Global Wind Organisation (GWO) BST/BTT certificates.

Request Consultation for SP09

Tan Cang Tech engineering team responds within 30 minutes — Free specialized technical consultation.