Transportation and Re-Installation Project of 02 STS Cranes at Long Son International Port
Client: Long Son International Port Joint Stock Company
Project Location: Tan Cang Phu Huu Port – Long Son International Port
Execution Period: Q3 – Q4 / 2023
Scope of Work: Turnkey logistics execution including sea fastening calculation, unlashing, roll-on barging, maritime transport, roll-off, mechanical re-assembly, electrical reconnection, alignment, and commissioning of two Ship-to-Shore (STS) container cranes.
Mobilizing advanced heavy-lift transport barges, hydraulic multi-axle modular transporters (SPMTs), and seasoned marine engineering specialists, Tan Cang Tech successfully executed the complex relocation of 02 STS cranes between terminals, achieving zero incidents and delivering full operational readiness on schedule.
Project Highlights & Technical Execution:
- Navigational & Tidal Simulation: Precise calculation of ballasting, barge draft, water depths, and bridge clearance along inland navigation channels.
- Roll-On / Roll-Off (Ro-Ro) Operations: Ballast pump management to maintain precise deck level with quay wall throughout the heavy roll-off process.
- Erection & Mechanical Re-Commissioning: Precision alignment of gantry bogies, reeving of main hoist wire ropes, boom hinge pin installation, and full load testing before client handover.