An in-depth analysis of preventive, predictive (CBM), corrective, and periodic overhaul maintenance strategies for Rubber-Tired Gantry (RTG) cranes in container ports.
Operational strategies and economic advantages of centralized fleet maintenance for heavy container tractors and terminal haulage trucks over individual driver outsourcing.
Comprehensive procedure for survey, lashing, packaging, permitting, and multimodal transportation of oversized and heavy-lift (OOG) industrial equipment at Tan Cang Tech.
Expert insights and engineering best practices in sea fastening, ro-ro barging, and structural integrity preservation during the transport of massive STS and RTG cranes.
Discover why Tan Cang Tech is the trusted heavy-lift marine contractor for the relocation, sea fastening, barging, and installation of STS and RTG port cranes in Vietnam.
Comprehensive maintenance, emergency breakdown troubleshooting, structural inspection, and major overhaul solutions for STS and RTG cranes by Tan Cang Tech.
Case study on the multimodal heavy-lift transport, route survey, and precision site offloading of industrial plant machinery for Hiep Phu Company.
Project report on sea fastening removal (unlashing), touch-up coating, ballast counterweight pouring, loading beam lifting, and commissioning of 02 STS cranes for Doosan Vina at Gemalink Port.
Engineering report on receiving, unlashing, roll-off, and commissioning of 03 Super Post-Panamax Mitsui STS cranes (65-ton capacity, 65m outreach) at Tan Cang Cai Mep Terminal.
Technical project report on unlashing, roll-off, portal bogie rotation, and track skidding of three STS container cranes for UNICO VINA at Saigon – Hiep Phuoc Port.









