SP06  |  PILLAR 1B — GREEN PORT & ESG SOLUTIONS

Shore Power & Cold Ironing
High-Voltage Shore Connection (HVSC) for Ocean-Going Vessels

Backed by the technical excellence of Saigon Newport Corporation (SNP) – Delivering clean grid power to berthing container ships, eliminating auxiliary engine emissions in compliance with IEC/ISO/IEEE 80005-1.

SLA:  Zero Vessel Berth Emissions  |  IEC/ISO/IEEE 80005-1 Standard  |  50Hz / 60Hz Dual Frequency  |  Turnkey EPC Installation

CONSULT SP06 SPECIALIST Explore Pillar

100%
Berth Emission Elimination
6.6/11kV
High-Voltage Shore Power
50/60Hz
Static Frequency Converter
0
Noise at Berth
OPERATIONAL CHALLENGES

6 Key Challenges We Solve

Common technical bottlenecks faced by ports and industrial terminals — and our proven solutions.

01
Massive Auxiliary Engine Pollution from Berthing Ships
Ocean container vessels running auxiliary engines at berth emit hundreds of tons of NOx, SOx, and PM2.5 pollutants into port cities.
02
Mandatory IMO & EU Fit-for-55 Regulations
International maritime regulations mandate shore power connectivity for container and passenger vessels by 2030.
03
Grid Frequency Incompatibility (50Hz Port vs 60Hz Ship)
Most international vessels operate on 60Hz onboard power, requiring complex static frequency conversion from 50Hz national grids.
04
Complex High-Voltage Maritime Safety Protocols
Connecting 6.6kV / 11kV cables between quay and ship requires automated cable management and interlocking safety systems.
05
Lack of Turnkey EPC Port Electrification Contractors
Few contractors possess combined expertise in heavy marine substations, cable management systems (CMS), and port operations.
06
High Initial Capital Expenditure Without Clear Phasing
Ports require staged investment roadmaps aligned with shipping line readiness schedules.
CORE COMMITMENTS

Specialized Capabilities & Superior SLA

Turnkey EPC Shore Power Engineering
Complete design, procurement, construction, and commissioning of quay substations, static frequency converters (SFC), and cable management systems.
Strict Compliance with IEC/ISO/IEEE 80005-1
Full adherence to international standardized shore connection protocols ensuring compatibility with all global carrier alliances.
Automated Quay Cable Management System (CMS)
Motorized mobile or trench-mounted cable dispensers facilitating connection in under 20 minutes from vessel mooring.
Smart Energy Metering & Billing Platform
Automated power consumption auditing, billing integration, and carbon credit reporting for terminal operators.
PROVEN TRACK RECORD

Case Studies & Measurable Impact

TAN CANG TECH
VERIFIED CASE

High-Voltage Shore Power (HVSC) FEED Study — Cai Mep Hub
Client: Tan Cang Cai Mep Terminals
7.5 MVA
Substation Capacity
6.6/11 kV
Dual Voltage Ready
100%
IEC 80005-1 Standard

Completed Front-End Engineering Design (FEED) for 7.5 MVA high-voltage shore power facility serving 18,000+ TEU mega container vessels at deep-water berths.

High-Voltage Shore Power (HVSC) FEED Study — Cai Mep Hub / Tan Cang Cai Mep Terminals
TAN CANG TECH
VERIFIED CASE

Low-Voltage Shore Power for Domestic Fleet — Cat Lai Port
Client: Saigon Newport Logistics
400V / 50Hz
Clean Power Delivery
100%
Barge Auxiliary Engines Off
Zero Noise
Berth Environmental Improvement

Commissioned 10 shore connection points for domestic feeder vessels and barges, eliminating auxiliary generator noise and exhaust across river berths.

Low-Voltage Shore Power for Domestic Fleet — Cat Lai Port / Saigon Newport Logistics
EXPERT FAQ

Frequently Asked Questions

What international standards govern shore power installations?
+
All our systems comply strictly with IEC/ISO/IEEE 80005-1 (High Voltage Shore Connection) and 80005-2 (Communication Protocol).
How does the system handle 50Hz grid to 60Hz vessel conversion?
+
We integrate static frequency converter (SFC) modules that seamlessly convert 50Hz grid input to stabilized 60Hz (440V / 6.6kV / 11kV) onboard vessel power.
How long does cable connection and synchronization take?
+
Using motorized Cable Management Systems (CMS), our certified operators connect and synchronize power within 15–20 minutes of vessel all-fast.

Request Consultation for SP06